Hello Bill
I hope you are doing great.
I have on job with two date variables "fromDate" and the current Date?
Is there a way that I can calculate the number of the days between the two dates to use in the command-Line Parameter?
Something like this: DateDiff(%fromDate% - GetDate())
I need one way to have the number of the days.
Please let me know if you need more details.
Thank you.